Matters needing attention before startup of silica gel tube


Time:

2021-09-15

1. check whether the host is in good condition and check whether the line has fallen off;
2. open the main power supply, the host heating, heating to the set temperature of five minutes, the host speed up to 5HZ, put into the film slowly running, the barrel outlet after the glue, can slowly accelerate. After softening the silica gel, connect the head, adjust the mold mouth, normal production.
3. when the machine stops, the silica gel in the barrel is extruded (not long idling). Open the nose, clean the rubber, so as not to affect the next production. Finally turn off the power.